Document Type

Report

Abstract

Peak hour electricity demand is associated with wholesale electricity prices that are sometimes more than 10 times higher than in off-peak periods. During these high-demand periods congested transmission lines and insufficient generation capacity can lead to brownouts and blackouts. This problem can be especially acute in urban centers. One way to alleviate this problem is to build new peaking plants. We investigated the costs and benefits, including expenditures and adverse health effects, of using existing backup generators and battery based electrical storage facilities to meet peak load demands rather than investing in a new power plant. Using small-scale generation located close to the point of use, rather than a centralized power plant with transmission lines to ship the electricity to where it is needed, is referred to as distributed electricity generation. We found that distributed generation in the form of existing generators installed for backup during blackouts could meet these peak demands cost-effectively. Small electrical storage facilities could also be used. To avoid the transfer of adverse health effects from urban centers to outlying areas, clean power generators must be used to charge the battery.

Publication Date

9-29-2008

Comments

Link Foundation Fellowship for the years 2006-2008

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.